- SSA - Black Start Procedures Rev 0(PDF, 484 KB)
- SSA Emergency Generator Black Start(PDF, 12.4 MB)
- SSA - Process Start up after PSD Rev 0(PDF, 486 KB)
- SSA - Process startup after ESD Rev 0(PDF, 317 KB)
- SSA - Planned Normal Shutdown Rev(PDF, 6.24 MB)
- SSA - Planned Shutdown from ESD Activation Rev 0(PDF, 9.23 MB)
- NNA-Black Start Procedure Rev0(PDF, 497 KB)
- NNA-Process Startup after ESD Rev 0(PDF, 485 KB)
- NNA - Planned Normal Shutdown(PDF, 12.66 MB)
- NNA Planned Shutdown from an ESD Activation Rev 0(PDF, 9.24 MB)
- NNA - Casing Bleed and Valve Replacement Rev 0(PDF, 242 KB)
Area B Lite
- SNA-SNX-Black start(PDF, 569 KB)
- SNA-SNX-Emergency Diesel Generator Black start(PDF, 277 KB)
- SNA-HPC B Seal Gas System Cold Startup(PDF, 285 KB)
- SNA-SNX-Process startup after PSD Rev 0(PDF, 567 KB)
- SNA-Turbine Gen Startup & Manual Sync With Another Turbine Gen(PDF, 722 KB)
- SNA-Turbine Generator startup and synchronization with another TG(PDF, 472 KB)
- SNA - Seawater Lift Pump Startup(PDF, 3.53 MB)
- SNA - SNX - Emergency Generator Sync with Turbine Gen(PDF, 285 KB)
- SNB-SNX - Glycol regeneration system startup(PDF, 3.5 MB)
- SNA-SNX - Planned Normal Shutdown Rev 0(PDF, 428 KB)
- SNA Complex - Planned Shutdown from ESD activation Rev 0(PDF, 298 KB)
- SNA-Receiving 12 inch Oil Pig from North Nemba Rev 0(PDF, 540 KB)
- SNA-SNX-Emergency Gen Sync with Turbine Generators(PDF, 285 KB)
- SNA - Seawater Lift Pumps Swapping(PDF, 3.52 MB)
- NNB - Black Start Procedure Rev0(PDF, 458 KB)
- NNB - Emergency Generator Black start Rev 0(PDF, 7.15 MB)
- NNB - Air Compressors Startup Procedures Rev 0(PDF, 398 KB)
- NNB - Glycol Regeneration System Startup(PDF, 3.58 MB)
- NNB - Platform Start Up After ESD(PDF, 446 KB)
- NNB - Process Startup after PSD Rev 0(PDF, 529 KB)
- NNB - Seawater Lift Pumps startup(PDF, 468 KB)
- NNB - TG Startup and Synchronization with another TG Rev0(PDF, 397 KB)
- NNB-Planned shutdown from ESD activation(PDF, 494 KB)
- NNB - Planned Normal Shutdown Rev 0(PDF, 3.28 MB)
- NNB - Fuel gas start-up and pressure adjustment Rev 0.docx(PDF, 465 KB)
- NNB - Launch 12 inch Pig to South Nemba Rev 0(PDF, 512 KB)
- NNB - Seawater Lift Pumps swapping Rev0(PDF, 388 KB)
- EK-Black start procedure(PDF, 3.34 MB)
- EK-Emergency Gen black Startup(PDF, 1.2 MB)
- EK-Air Compressors startup(PDF, 3.41 MB)
- EK-Black start procedure(PDF, 3.34 MB)
- EK-Deluge System Start Up and Testing(PDF, 486 KB)
- EK-Fuel gas start-up and pressure adjust Rev 0(PDF, 497 KB)
- EK-LP Tubine Gas Compressor Startup(PDF, 2.19 MB)
- EK-Platform Startup after ESD(PDF, 2.6 MB)
- EK-Process Startup Procedure Rev 0(PDF, 517 KB)
- EK - Crude Oil Transfer Pump Start up Rev 0(PDF, 9.42 MB)
- EK-Planned Total Field Shutdown ESD Act(PDF, 9.53 MB)
- EK - Planned Normal Shutdown Rev 0(PDF, 2.26 MB)
- EK-Power Outage Procedure.pdf(PDF, 1.46 MB)
- EK-Block 14 Oil Pigging Receiver Op(PDF, 1.78 MB)
- EK-Bomboco Oil Pigging Operation(PDF, 1.86 MB)
- EK-Emergency Power Sync to Main Power(PDF, 1.18 MB)
- EK-Fuel gas Swap from LP Gas Compr Disch to TGs Rev 0(PDF, 496 KB)
- EK-Launching 24 inches Oil Pig to Mal Terminal Rev 0(PDF, 554 KB)
- EK-Normal Power Sync to Emergency Power(PDF, 947 KB)
- EK-Compliance Test Procedure Rev 0(PDF, 2.21 MB)
- EK-Level Switches Compliance Test Procedure(PDF, 573 KB)
- WK - Black Start Procedure Rev0(PDF, 448 KB)
- WK - Emergency Diesel Generator Black start(PDF, 5.97 MB)
- WK - Process startup after ESD(PDF, 3.83 MB)
- WK - Process startup after PSD Rev 0(PDF, 11.58 MB)
- Bomboco -Black startup Rev 0(PDF, 9.45 MB)