* Click (+) to Expand
Block 14
- TL - Black Startup Rev0(PDF, 316KB)
- TL - Emergency Diesel Generator black startup Rev 0(PDF, 187KB)
- TL- Process startup after ESD Rev0(PDF, 765KB)
- TL-Crude Oil Export Pumps Startup(PDF, 279KB)
- TL-Hot Oil Circulation Startup(PDF, 476KB)
- TL-Process startup after PSD(PDF, 739KB)
- TL-Turbine Water Injection Pumps startup Rev0(PDF, 585KB)
- TL - Air Compressor Startup Rev 0(PDF, 491KB)
- TL - Flash Gas Compressor Startup Rev 0(PDF, 338KB)
- TL - MGC Compressor Startup Rev 0(PDF, 319KB)
- TL - Restart TL from West Setia Power If EDG is out of Service Rev0(PDF, 546KB)
- TL - SRM Package Startup Procedure Rev0(PDF, 722KB)
- TL -Turbine Generator startup and synchronization with another TG(PDF, 485KB)
- TL DPP Elec Startup after Abandon SD(PDF, 342KB)
- TL DPP Electrical startup after ESDor GTG SD(PDF, 321KB)
- TL Seawater Lift Pump startupRev0(PDF, 214KB)
- TL - Hydrate Prevention during Subsea Well Shut In(PDF, 518KB)
- TL Planned Normal Shutdown Rev 0(PDF, 552KB)
- TL Shutdown from ESD Activation(PDF, 504KB)
- TL- Methanol Decanting from Portable IMO Tank to Storage Tank(PDF, 284KB)
- TL-Subsea Boarding Valves Compliance Testing(PDF, 476KB)
- TL - 14 inch Pig KAH 6325 to Block O(PDF, 507KB)
- TL - 18 pig to EK Procedure Rev 0(PDF, 474KB)
- TL - Deluge System Testing and startup(PDF, 478KB)
- TL - Emergency Diesel Generator Sync with Turbine Generator(PDF, 181KB)
- TL Cooling Medium Startup Procedure(PDF, 9.08MB)
- TL Diesel Transfer from Supply Boat to Storage Tanks final ok(PDF, 198KB)
- TL Subsea Hot Oil Circulation(PDF, 456KB)
- TL Topside Surface Safety Valve SSV(PDF, 3.39MB)
- TL- Fuel Gas Heater Swap(PDF, 440KB)
- TL - Fire Water Pump ME-7486 7487 7488 test(PDF, 393KB)
- TL Fuel Gas Swapping From Primary to Buyback(PDF, 1.39MB)
- TL Glycol Regen Etron Sign Off(PDF, 912KB)
- TL SCSSV Testing Etron Sign offpdf(PDF, 1.18MB)
- TL Subsea Methanol Startup Procedure(PDF, 233KB)
- TL Testing FSV Subsea Riser's(PDF, 182KB)
- TL Topside Surface Control Subsurface Safety Valve SCSSV(PDF, 3.39MB)
- TL Underwater Safety Valve USV Testing(PDF, 926KB)
- BBLT - Black Start Up Procedure Rev 0(PDF, 611KB)
- BBLT - Emergency Diesel Generator Black Start Rev 0(PDF, 1.62MB)
- BBLT- Cooling Medium Pumps Startup Procedure Rev 0(PDF, 131KB)
- BBLT- Heavy Oil Train Start Up Procedures(PDF, 512KB)
- BBLT- Process Startup after PSD(PDF, 9.66MB)
- BBLT - EAL-4400 Heating Medium Heater Startup Rev 0(PDF, 6.04MB)
- BBLT - Emergency Diesel Generator Sync to Turbine Generator Rev 0(PDF, 1.69MB)
- BBLT - Light Oil Train #1 startup(PDF, 548KB)
- BBLT - Light Oil Train #2 startup(PDF, 523KB)
- BBLT - Main Gas Compressors Start up Procedure Rev 0(PDF, 188KB)
- BBLT - MAIN GENERATOR START UP(PDF, 512KB)
- BBLT - Platform Startup after ESD1 2 Shutdown Rev 0(PDF, 191KB)
- BBLT - Sea water lift pumps start up Rev0(PDF, 497KB)
- BBLT - Turbine WI Pump Start Up Procedures Rev 0(PDF, 475KB)
- BBLT -Flash Gas Compressor Start Up Procedure Rev 0(PDF, 9.11MB)
- BBLT - Planned Shutdown from ESD activationon(PDF, 6.42MB)
- BBLT - Shutdown Procedure Rev 0(PDF, 248KB)
- BBLT - Subsea Wells Shut-In and Opening(PDF, 537KB)
- BBLT - Deluge System Testing(PDF, 1.7MB)
- BBLT - Surface Controlled Subsurface Safety Valve Testing Rev 0(PDF, 3.4MB)
- BBLT - Underwater Safety Valves Testing(PDF, 6.3MB)
- BBLT- Divert Produced Water to Malongo Terminal Rev0(PDF, 220KB)
- BBLT - Automatic Generator Parallel Operation Rev 0 (2)(PDF, 349KB)
- BBLT - Air Compressor Reset(PDF, 498KB)
- BBLT - Bleed off Subsea center A 10 inch to HP Flare KO.V(PDF, 339KB)
- BBLT - Bleed off Subsea center A 8 inch to HP Flare KO. v(PDF, 352KB)
- BBLT - Bleed off Subsea center B 10 Riser to HP Flare KO Drum(PDF, 664KB)
- BBLT - Bleed off Subsea center C 10 inch Riser to HP Flare KO(PDF, 498KB)
- BBLT - Bleed off Subsea center C 8 inch Riser to HP Flare KO Drum(PDF, 500KB)
- BBLT - Bridle Flushing Procedure Rev0(PDF, 509KB)
- BBLT - Closed Drain Mitigation(PDF, 500KB)
- BBLT - Cooling Medium Pumps Swapping Procedure Rev 0 (5)(PDF, 141KB)
- BBLT - HP_LP Fuel Gas Pressure Control Valves Rev 0(PDF, 147KB)
- BBLT - Loss of Instrument Air Rev 0(PDF, 139KB)
- BBLT - Pigging Operation-Launch 16 inch Gas Pig To S.Nemba Rev0(PDF, 570KB)
- BBLT - Pigging Operation - Launch 20 inch Pig to EK Rev 0(PDF, 546KB)
- BBLT - Procedure for Float Over Produced Water Flash Vessel Rev 0(PDF, 152KB)
- BBLT - Produced Water Vessel Bridle Flushing(PDF, 327KB)
- BBLT - Protocol to Handle Process in Case of Alarm on Matrix Panel(PDF, 154KB)
- BBLT - Solar Turbine Generator Swapping Using Manual Sync Rev 0(PDF, 310KB)
- BBLT - Subsea Gas Lift Dehydration using Methanol Rev 0(PDF, 160KB)
- BBLT - Subsea Hot Oil Circulation Pumps Rev 0(PDF, 132KB)
- BBLT - Subsea Risers SDV Testing Procedure Rev 0(PDF, 132KB)
- BBLT - Swapping Fuel Gas From Primary Fuel Gas ro Buy Back.doc(PDF, 512KB)
- BBLT - Topside Surface Control Subsurface Safety Valve Testing(PDF, 497KB)