mafumeira sul
The Mafumeira Field is located in Block 0 approximately 15 miles West of Cabinda. The Water depth varies between 40 and 160 feet. The Mafumeira (MAF) Fields are centrally controlled from the Central Processing Complex (CPC), which is comprised of the Living Quarters Platform (LQP) and bridge linked to a central Production Processing Platform (PPP). Norte, Centro and Sul are Wellhead Platforms (WHPs) linked to the PPP individually through an array of pipelines, power and communication systems
Click On The Image To Enlarge
vision statement
We will apply all Corporate and SASBU Operating Expectations and meet SASBU OE Metrics
We will meet or exceed all Chevron and SASBU Operating and OE requirements, including,
but not limited to, Compliance, The Chevron Way, Permit-to-Work. We will not take short cuts
to achieve our goals; we work ethically and with integrity. Our work is always guided by Chevron's
Operational Excellence two key principles: 'Do it safely or not at all' and 'There is always time to do it right'
Read More
We believe zero HES incidents is attainable
Our fundamental belief is that we can operate with ZERO incidents. We believe it is possible to work every day without an incident. It is the belief that 'today I can work without an incident'. This belief continuously applies to tomorrow and is at the core of our Operations.
We will be recognized as a High-Performing Team respecting individual contributions
We believe that everyone aboard has value to add – no one is 'just a' technician or operator or room boy. We treat everyone as part of the body – no one body part can act on its own without support from the rest of the body. We will actively promote an environment of good team communication based upon our Team Values of trust, constructive conflict, commitment, accountability and results.
We will join the Production Engineers, using our Operating Expertise, to manage reservoirs to end of field life
We will be good stewards of the reservoirs. We will actively manage and monitor performance and assure the wells are able to produce efficiently over the life of the asset.
We will meet or exceed Customer Expectations
We challenge ourselves to always deliver over and above our customers' expectations. In everything we do, we will not be satisfied with just meeting what was expected from our customers (e.g., our production numbers, our reliability/availability numbers, delivering on our budgets, equipment compliance, etc.) but exceeding those expectations.
We believe zero Unplanned Breakdowns is attainable
Our fundamental belief is that we operate our facility with ZERO unexpected breakdowns. We know and believe it is possible to conduct daily operations without inadvertent failures, so when they do happen, it becomes the exception and not the norm.
We will be recognized for Training, Confidence and Competence in Operations within Angola
We will be recognized Angola-wide - by the community we work in, by our JV Partners, by our competitors, by the Government - that we produce the best high-performing National Operators and Technicians who are recognized not only for their skills but also their integrity.
We will apply Continuous Improvement Processes to support the Vision
We continuously look for opportunities to improve. We will not accept the status quo and paradigms (this is the way we have always done things or this is the way we did things in my last position). We will always challenge processes and technology to look for opportunities to create value on a global level, for the Business Unit and for the high-performing team, of which each of us is an integral part.
Hide Content